facebook pinterest linkedin twitter youtube
Home Projects Magnetic Fenton Process Project

Shanxi Datong yudong Waste Water Plant

Shanxi Datong yudong Waste Water Plant

November 12, 2025

Shanxi Datong Project: Wastewater Type: Pharmaceutical wastewater.

 

Process Evolution:

Phase I: Initially employed an Ozone Oxidation process, which failed to meet treatment targets. It was subsequently retrofitted into a Fluidized Bed Fenton process.

Phase II:  Adopted Magnetic Fenton technology.

Comparative Advantage: Both phases treat the same wastewater, providing a direct and fair comparison.

The Magnetic Fenton system demonstrated a 90% reduction in failure rate and a 40% reduction in operating costs compared to the Fluidized Bed Fenton system.

Annual operational savings exceeding 15 million RMB. This project serves as an ideal reference site for a side-by-side comparison of both Fenton technologies, allowing for direct data collection and validation of Magnetic Fenton's technical superiority.

 

Project Overview

 

With a total design capacity of 100,000 m3/day, the plant primarily treats wastewater from a pharmaceutical industrial park and pharmaceutical intermediate production, characterized by poor biodegradability and high difficulty in COD removal. The Phase I project initially adopted an ozone oxidation process as the advanced oxidation technology, which failed to meet the expected treatment targets. It was subsequently converted into a fluidized bed Fenton system, while the Phase II project directly employed the Magnetic Fenton technology.

 

1. Process Simplified from 3 Stages to 1: The effluent consistently meets the standard of less than 40 mg/L COD, eliminating the need for subsequent sand filtration and activated carbon filtration. This results in a significantly shortened process chain.

2. System Failure Rate Reduced by 90%: Reactor shutdowns for maintenance have been eliminated (saving over 2 million RMB annually), drastically reducing the on-site workload. Additionally, the need for media replacement or replenishment is completely removed.

3. Nearly 1 Million kWh of Electricity Saved Annually: This represents a substantial reduction in power consumption and associated carbon emissions.

4. Overall Operating Costs Reduced by 40%: Annual operational savings exceeding 15 million RMB.

 

Site view Comparison

 

                                         

  As a sub-brand under Guangzhou jinchuan Environmental Protection Equipment Co., Ltd., we are dedicated to serving the global water treatment market. jinchuan is established in 1993, which is a technology-driven enterprise specializing in electrochemical research. With decades of expertise in catalytic oxidation, electrolysis, disinfection, and the R&D, design, and manufacturing of electrochemical and water treatment equipment, we are one of China's most experienced companies in this f...
Room 814, Building 8, No. 80, Shilian Road (Shiqi Village Section), Shiqi Town, Panyu District, Guangzhou, China
Subscribe to Our Newsletter
Please Read On, Stay Posted, Subscribe, And We Welcome You To Tell Us What You Think.
SIGN UP
Follow Us
facebook pinterest linkedin twitter youtube

Copyright @ Esegen (Guangzhou) Technology Co., Ltd All Rights Reserved. Network Supported

XML Privacy Policy

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Home

Products

WhatsApp

contact